SH 249 TO IH 45(N)
Segment F-2
 

Click on the links below to view or download the specific documents. You must have a copy of Adobe Acrobat in order to view these documents. Adobe Acrobat can be downloaded at the following website.

Documents are available below in PDF format. Please click on the icon at the bottom of the page to get a copy.
 

Segment F-2 Record of Decision (ROD) (December 2009)

Notice of Meeting With Affected Property Owners (MAPO) (November 12, 2008)

(MAPO) Handouts for Segment F-2 Public Meeting (November 12, 2008)

Segment F-2 Final Environmental Impact Statement (August 2008)

Seg F-2 FEIS Volume_I

Seg F-2 FEIS Volume_II

Seg F-2 FEIS Volume III Exhibits

Seg F-2 FEIS Volume_III Appendices

Seg F-2 FEIS Volume_IV

The Northern Alignment Feasibility Study is available for viewing or download, here

Segment F-2 Revised Draft Environmental Impact Statement (May 2006)

VOLUME I

VOLUME II

VOLUME III

EXHIBITS

Exhibit F-2-1  The Grand Parkway Project Location and Status

Exhibit F-2-2  Study Area for Segments E, F-2, F-2, and G

Exhibit F-2-3  Project Development Process

Exhibit F-2-4  Year 2000 Average Daily Traffic Volumes

Exhibit F-2-5  Year 2000 Levels of Mobility

Exhibit F-2-6  Year 2010 Average Daily Traffic Volumes: No-Build/Build Alternatives

Exhibit F-2-7  Year 2010 No-Build Levels of Mobility

Exhibit F-2-8  Year 2015 Average Daily Traffic Volumes: No-Build/Build Alternatives

Exhibit F-2-9  Year 2015 No-Build Levels of Mobility

Exhibit F-2-10  Year 2025 Average Daily Traffic Volumes: No-Build/Build Alternatives

Exhibit F-2-11  Year 2025 No-Build Levels of Mobility

Exhibit F-2-12  Evacuation Routes

Exhibit F-2-13  Alternative Corridors

Exhibit F-2-14  The Preferred Alternative Corridor

Exhibit F-2-15 a-e  Environmental Constraints

Exhibit F-2-16  Year 2010 Build Levels of Mobility

Exhibit F-2-17  Year 2015 Build Levels of Mobility

Exhibit F-2-18  Year 2025 No-Build Levels of Mobility

Exhibit F-2-19  Geologic Features

Exhibit F-2-20  Historic Subsidence in the Houston Metropolitan Area, 1906-1995

Exhibit F-2-21  Employment and PopulationDistribution from 1980

Exhibit F-2-22  Employment and Population Distribution from 1990

Exhibit F-2-23  Employment and Population Distribution from 2000

Exhibit F-2-24  Projected Employment and Population Distribution for 2025

Exhibit F-2-25 a-d  1970-2000 Development Patterns in the Project's Area of Influence

Exhibit F-2-26 a-e  Mobile Source Air Toxics (MSAT) Sensitve Receptors

Exhibit F-2-27  Mobile Source Air Toxics (MSAT) Travel Study Area Links

Exhibit F-2-28  Gulf Coast Aquifer

Exhibit F-2-29  Coastal Zone Management

Exhibit F-2-30  Potential Archeological Liability Mapping (PALM)

Exhibit F-2-31  Area of Influence and Travel Contours

Exhibit F-2-32  Watershed Resource Study Area

Exhibit F-2-33  Katy Prairie Resource Study Area

Exhibit F-2-34  2005 Base Land Use Map

Exhibit F-2-35  2025 No-Build Alternative Land UseMap

Exhibit F-2-36  2025 Build Alternative Land Use Map

Exhibit F-2-37 a  USGS/NOAA Draft NLCD 2001 for the Area of Influence

Exhibit F-2-37 b  2005 Base Land Use – USGS/NOAA Draft NLCD 2001

Exhibit F-2-37 c  2025 No-Build Undeveloped Land – USGS/NOAA Draft NLCD 2001

Exhibit F-2-37 d  2025 Build Undeveloped Land – USGS/NOAA Draft NLCD 2001

Exhibit F-2-37 e  2025 Indirect Impact Area – USGS/NOAA Draft NLCD 2001

Exhibit F-2-38  Segment F-2 Project Area

Exhibit F-2-39 a-d  USGS Topographic Maps

Exhibit F-2-40 a-b  Proposed Typical Sections – Toll Road

Exhibit F-2-41  Segment F-2 Land Use

Exhibit F-2-42  Segment F-2 Farmland Soils

Exhibit F-2-43  Segment F-2 Census Tracts

Exhibit F-2-44  Segment F-2 Community Resources

Exhibit F-2-45  Segment F-2 Ambient Noise Level Montoring Sites

Exhibit F-2-46  Segment F-2 WaterResources

Exhibit F-2-47  Segment F-2 Bottomland Hardwoods and Riparian Forests

Exhibit F-2-48  Segment F-2 Potential Historic-Age Resources

Exhibit F-2-49  Segment F-2 Oil/Gas Wells, Hazardous Materials, and Pipeline Sites

Exhibit F-2-50  Segment F-2  Noise Receiver Locations

Exhibit F-2-51  Segment F-2 Possible Noise Barrier Locations

Exhibit F-2-52   Segment F-2 Recommended Alternative Alignment

APPENDICES

Appendix A FHWA Memorandum from the Office of NEPA Facilitation 

Appendix B  Correspondence Letters from Federal, State, and Local Agencies

Appendix C  H-GAC 2025 RTP Projects in the Grand Parkway AOI

Appendix D  Congestion Management Analysis

Appendix E  City of Houston Growth Indicator Newsletters

Appendix F  Mobile Source Air Toxics Technical Report

Appendix G  I-69/TTC Project Brochure and Recommended Reasonable Corridors

Appendix H NRHP Eligibility Status on Segment F-2 Pre-1957 Sites 

Appendix I  Segment F-2 Hazardous Materials Data Search

Appendix J  Segment F-2 Prime Farmlands

Appendix K  Segment F-2 Environmental Justice

Appendix L  Segment F-2 Economic Effects

Appendix M  USACE Adjacent/Isolated Criteria

Appendix N  Segment F-2 Wetland Impacts

Appendix O  Summary of Scoping/Workshop Meetings

Working Papers

Interim Working Paper 2: Secondary Development Analysis, December 2000

Public Workshop No.3/Preliminary Alignment Workshops Summary Report, October 2000

Interim Working Paper 1: Socioeconomic and Corridor Study, April 2000

Public Workshop No. 2/Preliminary Corridors Workshops Summary Report, Feburary 2000

Public Workshop No. 1/Project Initiation Workshops Summary Report, August 1999

Interim Working Paper 2: Secondary Development Analysis, December 2000

7.5MB Interim Working Paper.pdf
16MB Interim Working Paper (Color).pdf
16MB Exhibit3.pdf
10.5MB Exhibit4.pdf
8.5MB Exhibit5.pdf
9.0MB Exhibit6.pdf
10.0MB Exhibit7.pdf
11.0MB Exhibit8.pdf
12.0MB Exhibit9.pdf
11.5MB Exhibit10.pdf

 

 

 

 

 

 

Public Workshop No.3/Preliminary Alignment Workshops Summary Report, October 2000

4.0MB Cover.pdf
800KB Handouts.pdf
2.5MB Registration.pdf
2.5MB Video Presentataion.pdf
3.5MB Workshop Notification.pdf
3.0MB Workshop Summary.pdf
30.0MB Written Comments.pdf

 

 

 

 

Interim Working Paper 1: Socioeconomic and Corridor Study, April 2000

6.0MB Interim Working Paper.pdf
27.5MB Interim Working Paper (Color).pdf
16.5MB Exhibit3.pdf
14.0MB Exhibit9.pdf
14.0MB Exhibit10.pdf
9.0MB Exhibit11.pdf
13.0MB Table3.pdf
14.0MB Table6.pdf

 

 

 

 

 

Public Workshop No. 1/Project Initiation Workshops Summary Report, August 1999

7.0MB Cover.pdf
176KB Handouts.pdf
1.4MB Registration.pdf
1.5MB Video Presentataion.pdf
2.5MB Workshop Notification.pdf
3.0MB Workshop Summary.pdf
5.0MB Written Comments.pdf

 

 

 

 

NOTE: Adobe Acrobat is required to view the Newsletters. Click on the icon to get a copy.

 
Please click the icon below to access the corresponding agency’s website